High-Performance Surface Treatment
Next Generation Concrete Surface (NGCS)
High-Performance Pavement Surface Treatment
NGCS (Next Generation Concrete Surface) is a next-generation pavement surface treatment technology that applies longitudinal intaglio grooving after diamond grinding (DG) on concrete pavement surfaces.
It dramatically improves smoothness, skid resistance, and noise issues on existing concrete roads, maximizing safety and convenience for road users. Developed by the U.S. FHWA (Federal Highway Administration) and validated worldwide, HEXACON was the first in Korea to introduce this technology and possesses the highest level of construction capabilities.
- Functional recovery and performance improvement of concrete pavements
- Noise reduction and driving safety enhancement
- Hydroplaning prevention for wet weather safety
- Pavement life extension and maintenance cost reduction
NGCS Performance
Key performance improvement indicators measured after NGCS application.
Performance Improvement Data
1. Noise Reduction
4~6dB(A) noise reduction compared to conventional roads
*Korea Expressway Corporation, "Concrete Pavement Surface Improvement Noise Reduction Measurement & Analysis", 2019. 04
Noise Test Results After High-Performance Surface Treatment
Sound Intensity Level, dB(A)
2. Ride Comfort
Post-construction smoothness 0.88m/km, IRI improved by 0.65m/km
IRI (m/km)
| Phase | Test | IRI (m/km) | Average | |
|---|---|---|---|---|
| Left | Right | |||
| Before | 1 | 1.42 | 1.41 | 1.53 |
| 2 | 1.57 | 1.64 | ||
| 3 | 1.45 | 1.70 | ||
| After | 1 | 0.77 | 0.91 | 0.88 |
| 2 | 0.90 | 1.04 | ||
| 3 | 0.85 | 0.81 | ||
3. Safety
Post-construction Skid Number (SN) 52.7
Measurement Count
| Test | SN (Skid Number) | Average | ||
|---|---|---|---|---|
| 1 | 51.6 | 52.9 | 58.0 | 52.7 |
| 2 | 51.3 | 50.1 | 53.1 | |
| 3 | 53.6 | 52.4 | 51.6 | |
Construction Method
NGCS is constructed in a 2-step process. After Step 1 diamond grinding, Step 2 longitudinal grooving is applied to achieve optimal surface performance.
Step 1: Diamond Grinding (DG)
Diamond grinding for micro-texture formation on the existing concrete surface. The concrete pavement is precisely cut longitudinally using diamond blades to achieve smoothness and remove surface defects.
Step 2: Longitudinal Grooving
Longitudinal grooving for intaglio surface texture formation. Grooves maximize drainage performance during wet conditions, achieving improved skid resistance and noise reduction.
NGCS Method Details
Surface Texture
Specifications
Construction Gallery
Equipment Inventory
Specifications of specialized equipment deployed for NGCS construction.
| Model | Quantity | Length (M) | Height (M) | Width (M) | Cutting Width (M) | Weight (Tons) | Horsepower (HP) |
|---|---|---|---|---|---|---|---|
| PC-6000 | 3 | 14.3 | 3.3 | 2.5 | 1.27 | 24 | 685 |
| PC-4500 | 1 | 8.5 | 2.9 | 2.2 | 1.27 | 22 | 540 |
Project Track Record
HEXACON has been performing NGCS construction on major expressways and national roads nationwide since 2014.
| Year | Client | Route | Length (m) | Area (㎡) | Type |
|---|---|---|---|---|---|
| 2025 | Korea Expressway Corp. (Hanwha) | Pohang-Yeongdeok Exp. Sec. 1 (Heunghae Tunnel) | 1,269 | 17,507 | Tunnel |
| Korea Expressway Corp. (DLENC) | Pohang-Yeongdeok Exp. Sec. 2 (Cheongha Tunnel) | 2,695 | 36,119 | Tunnel | |
| Korea Expressway Corp. (Daewoo) | Pohang-Yeongdeok Exp. Sec. 3 (Namjeong 1,2 Tunnel) | 622 | 8,347 | Tunnel | |
| Korea Expressway Corp. (Hyundai) | Pohang-Yeongdeok Exp. Sec. 4 (Namjeong 4,5,6 Tunnel) | 2,965 | 39,741 | Tunnel | |
| Korea Expressway Corp. (DL E&C) | Saemangeum-Jeonju Exp. Sec. 6 (Wansan Tunnel) | 3,612 | 35,865 | Tunnel | |
| Korea Expressway Corp. (DLENC) | Saemangeum-Jeonju Exp. Sec. 7 (Godeok 1,2 Tunnel) | 2,710 | 35,757 | Tunnel | |
| Korea Expressway Corp. (Doosan) | Saemangeum-Jeonju Exp. Sec. 8 (Sanggwan Tunnel etc.) | 5,690 | 76,247 | Tunnel, Bridge | |
| Korea Expressway Corp. (POSCO) | Gangjin-Gwangju Exp. Sec. 2 (Jakcheon 2 Tunnel) | 1,470 | 21,160 | Tunnel | |
| Korea Expressway Corp. (Heunghwa) | Gangjin-Gwangju Exp. Sec. 3 (Geumjeong Tunnel) | 1,200 | 16,804 | Tunnel | |
| Sindaegu-Busan Expressway | Daegu-Busan Exp. | 205 | 2,704 | Open | |
| Incheon Free Economic Zone (Hanwha) | 3rd Bridge to Mainland | 1,933 | 25,909 | Bridge | |
| Korea Expressway Corp. Busan-Gyeongnam (Improvement) | Gyeongbu Exp. 7.5k (Both Directions) | 1,864 | 41,116 | Open, Noise Barrier | |
| Korea Expressway Corp. Busan-Gyeongnam | Miryang-Ulsan Exp. etc. | 2,985 | 26,872 | Open | |
| Korea Expressway Corp. Capital Region | Yeongdong Exp. (Maseong Tunnel, Incheon) | 1,470 | 14,774 | Tunnel | |
| Korea Expressway Corp. Gangwon (Improvement) | Yeongdong Exp. (Daegwallyeong 5 Tunnel, Incheon) | 1,000 | 10,350 | Tunnel | |
| Korea Expressway Corp. Chuncheon | Seoul-Yangyang Exp. (Geumnam Tunnel etc.) | 2,336 | 9,809 | Tunnel | |
| 2024 | Korea Expressway Corp. (Hanshin) | Anseong-Yongin Exp. Sec. 1 (Geumgwang Tunnel) | 1,900 | 39,000 | Tunnel |
| Korea Expressway Corp. (Dongbu) | Anseong-Yongin Exp. Sec. 3 (Gosam Tunnel) | 2,700 | 54,000 | Tunnel | |
| Korea Expressway Corp. (Gyeryong) | Anseong-Yongin Exp. Sec. 4 (Ssangryeong, Munsu 1 Tunnel) | 2,700 | 54,000 | Tunnel | |
| Korea Expressway Corp. (KR) | Anseong-Yongin Exp. Sec. 5 (Unhak Tunnel) | 2,900 | 59,000 | Tunnel | |
| Korea Expressway Corp. (Samhwan) | Anseong-Yongin Exp. Sec. 7 (Pogok 1, Pogok 2 Tunnel) | 3,500 | 81,000 | Tunnel | |
| Korea Expressway Corp. (Daelim) | Yongin-Guri Exp. Sec. 9 (Opo 1, Opo 3 Tunnel) | 900 | 19,500 | Tunnel | |
| Korea Expressway Corp. (Daelim) | Yongin-Guri Exp. Sec. 11 (Namhansanseong Tunnel) | 8,500 | 166,000 | Tunnel | |
| Korea Expressway Corp. (Taeyoung) | Yongin-Guri Exp. Sec. 13 (Godeok Tunnel) | 3,800 | 88,000 | Tunnel | |
| Korea Expressway Corp. (Hyundai) | Yongin-Guri Exp. Sec. 14 (Godeok Topyeong Bridge) | 1,100 | 24,000 | Bridge | |
| Korea Expressway Corp. (Daelim) | Paju-Yangju Exp. Sec. 1 (Sambang 3 Bridge) | 500 | 7,200 | Bridge | |
| Korea Expressway Corp. (Goryeo) | Paju-Yangju Exp. Sec. 2 (Biam, Deokdo, Sambang Tunnel, Deokdo 1 Bridge, Sambang 4 Bridge) | 5,600 | 78,000 | Tunnel, Bridge | |
| Korea Expressway Corp. (Daewoo) | Paju-Yangju Exp. Sec. 3 (Eunhyeon 1, Eunhyeon 2 Tunnel) | 1,000 | 14,000 | Tunnel | |
| Korea Expressway Corp. (Taeyoung) | Paju-Yangju Exp. Sec. 4 (Hoeamcheon Bridge) | 1,300 | 18,000 | Bridge | |
| Korea Expressway Corp. (Kolon) | Changnyeong-Miryang Exp. Sec. 2 (Yeongsan Tunnel) | 6,500 | 71,000 | Tunnel | |
| Korea Expressway Corp. (Kumho) | Changnyeong-Miryang Exp. Sec. 6 (Bubuk 2, Sanoe 1 Tunnel) | 4,000 | 54,000 | Tunnel | |
| Korea Expressway Corp. Capital Region | Capital Beltway (Suri Tunnel) | 1,900 | 51,000 | Tunnel | |
| Korea Expressway Corp. Gangwon | Yeongdong Exp. (Daegwallyeong 1, 5 Tunnel etc.) | 3,200 | 44,000 | Tunnel | |
| Korea Expressway Corp. Central Improvement Unit | Jungang Exp. (Gulji, Wonchang, Wonmu 1,2 Tunnel) | 2,300 | 31,000 | Tunnel | |
| 2023 | Korea Expressway Corp. (Lotte) | Asan-Cheonan Exp. Sec. 2 | 800 | 14,610 | Bridge |
| Korea Expressway Corp. (Daewoo) | Asan-Cheonan Exp. Sec. 3 | 2,600 | 34,987 | Bridge | |
| Korea Expressway Corp. (Halla) | Gyeongbu Straightening Sec. 1 | 980 | 32,760 | Tunnel | |
| Korea Expressway Corp. (Daewoo) | Gyeongbu Straightening Sec. 3 | 322 | 10,800 | Tunnel | |
| Korea Expressway Corp. Capital Region | Seohaean, Jungbu 2nd Exp. | 2,000 | 22,494 | Open | |
| Korea Expressway Corp. Busan-Gyeongnam | Jungbu Inland Exp. | 400 | 1,340 | Open | |
| Korea Expressway Corp. Daegu-Gyeongbuk | Gyeongbu Exp. | 700 | 6,945 | Bridge | |
| Korea Expressway Corp. East Seoul | Capital Beltway | 270 | 3,600 | Bridge | |
| 2022 | Korea Expressway Corp. (Doosan) | Hwado-Yangpyeong Exp. Sec. 2 | 2,600 | 35,000 | Tunnel |
| Korea Expressway Corp. (Doosan) | Anseong-Buk Suwon Improvement Sec. 1 | 500 | 12,060 | Tunnel | |
| Korea Expressway Corp. (Hanjin) | Anseong-Buk Suwon Improvement Sec. 2 | 500 | 15,300 | Tunnel | |
| Choji Bridge Construction (Hyundai Asan) | Yakam 1 Bridge | 360 | 2,412 | Asphalt Concrete | |
| Korea Expressway Corp. Gyeongbuk | Gyeongbu, Gwangju-Daegu Exp. | 300 | 6,030 | Open, Bridge | |
| Korea Expressway Corp. Busan-Gyeongnam | Jungbu Inland Exp. | 620 | 4,154 | Open | |
| Korea Expressway Corp. Chungbuk | Cheongwon-Sangju Exp. | 600 | 4,020 | Open | |
| 2021 | Korea Expressway Corp. (Hanwha) | Daegu Beltway Sec. 1 | 1,200 | 15,066 | Bridge |
| Korea Expressway Corp. (Daewoo) | Daegu Beltway Sec. 2 | 1,400 | 18,650 | Open, Tunnel | |
| Korea Expressway Corp. (Kumho) | Daegu Beltway Sec. 4 | 740 | 9,540 | Bridge | |
| Korea Expressway Corp. (Hoban) | Daegu Beltway Sec. 5 | 1,100 | 14,460 | Bridge | |
| Korea Expressway Corp. (Lotte) | Hwado-Yangpyeong Exp. Sec. 1 | 4,000 | 53,558 | Tunnel | |
| Korea Expressway Corp. (Hanwha) | Bongdam-Songsan Exp. Sec. 3 | 970 | 6,540 | Bridge | |
| Korea Expressway Corp. Busan-Gyeongnam | Gyeongbu Exp. | 570 | 7,644 | Open | |
| Korea Expressway Corp. Daegu | Gyeongbu Exp. | 500 | 5,360 | Open | |
| Korea Expressway Corp. Gumi | Gyeongbu Exp. | 1,200 | 16,281 | Open | |
| 2020 | Korea Expressway Corp. (Ssangyong) | Miryang-Ulsan Exp. Sec. 2 (Sanoe 3 Tunnel) | 1,767 | 24,624 | Tunnel |
| Korea Expressway Corp. (Daebo) | Miryang-Ulsan Exp. Sec. 3 (Danjang Tunnel 1,3) | 3,688 | 49,205 | Tunnel | |
| Korea Expressway Corp. (Ssangyong) | Miryang-Ulsan Exp. Sec. 2 (Sanoe 3 Tunnel etc.) | 2,592 | 34,841 | Tunnel | |
| Korea Expressway Corp. (Ssangyong) | Miryang-Ulsan Exp. Sec. 4 (Danjang 4 Tunnel) | 3,860 | 51,640 | Tunnel | |
| Korea Expressway Corp. (SK) | Miryang-Ulsan Exp. Sec. 5 (Jaeyaksan Tunnel) | 7,982 | 106,490 | Tunnel | |
| Korea Expressway Corp. (Sambu) | Miryang-Ulsan Exp. Sec. 6 (Sangbuk Tunnel) | 6,464 | 86,255 | Tunnel | |
| Korea Expressway Corp. (Daelim) | Miryang-Ulsan Exp. Sec. 7 | 1,017 | 6,325 | Open | |
| Korea Expressway Corp. (Hanshin) | Miryang-Ulsan Exp. Sec. 8 | 1,941 | 44,153 | Bridge | |
| Korea Expressway Corp. (Kolon) | Miryang-Ulsan Exp. Sec. 10 (Ungchon Tunnel) | 1,802 | 16,408 | Tunnel | |
| Korea Expressway Corp. Cheongsong | Sangju-Yeongdeok Exp. (Black Ice Repair) | 180 | 1,206 | Bridge | |
| Korea Expressway Corp. Muju | Tongyeong-Daejeon Exp. (Black Ice Repair) | 330 | 2,211 | Bridge | |
| Korea Expressway Corp. Namwon | Gwangju-Daegu Exp. (Black Ice Repair) | 1,220 | 8,174 | Bridge | |
| Korea Expressway Corp. Boeun | Cheongju-Yeongdeok Exp. (Black Ice Repair) | 680 | 4,556 | Bridge | |
| Korea Expressway Corp. Gurye | Suncheon-Wanju Exp. (Black Ice Repair) | 210 | 2,814 | Bridge | |
| Korea Expressway Corp. Hongcheon | Jungang Exp. (Black Ice Repair) | 350 | 2,337 | Bridge | |
| Korea Expressway Corp. Jecheon | Jungang Exp. (Black Ice Repair) | 1,860 | 14,680 | Bridge | |
| Sanseong Tunnel Access Sec. 3 | Sanseong Tunnel Access | 2,200 | 14,680 | Tunnel | |
| Cheonan-Nonsan Expressway | Cheonan-Nonsan Exp. | 1,100 | 6,900 | Open | |
| Korea Expressway Corp. Jeonbuk | Tongyeong-Daejeon Exp. | 1,130 | 15,109 | Open | |
| Uijeongbu Land Mgmt. Office | National Route 3 | 2,750 | 27,986 | Open | |
| 2019 | Korea Expressway Corp. Busan-Gyeongnam | Jungbu Inland Exp. | 500 | 6,300 | Open |
| Korea Expressway Corp. Chungbuk | Jungbu Inland Exp. | 800 | 10,080 | Open | |
| Jungbu Inland Improvement Sec. 2 (Namyang) | Jungbu Inland Exp. | 5,000 | 32,830 | Open | |
| Capital Area Improvement Unit | Jungbu Exp. | 319 | 5,030 | Bridge | |
| Korea Expressway Corp. Hwaseong | Pyeongtaek-Jecheon Exp. | 610 | 12,546 | Open | |
| 2018 | Korea Expressway Corp. (Hanwha) | Exp. Route 1, Eonyang-Yeongcheon Sec. 4 | 5,400 | 36,280 | Open |
| Korea Expressway Corp. Busan-Gyeongnam | Namhae Exp. | 600 | 3,000 | Open | |
| Busan City (POSCO) | Sanseong Tunnel | 4,800 | 48,736 | Tunnel | |
| Cheonan-Nonsan Expressway | Cheonan-Nonsan Exp. | 700 | 6,900 | Open | |
| Korea Expressway Corp. Dangjin | Seohaean Exp. | 500 | 4,135 | Open | |
| Korea Expressway Corp. (Taeyoung) | Exp. Route 1, Eonyang-Yeongcheon Sec. 5 | 400 | 2,763 | Open | |
| 2017 | Korea Expressway Corp. (Daewoo) | Donghongcheon-Yangyang Exp. Sec. 6 (Hwachon 9 Tunnel) | 2,800 | 35,016 | Tunnel |
| Korea Expressway Corp. (Daewoo) | Donghongcheon-Yangyang Exp. Sec. 8 (Seoseok Tunnel) | 2,300 | 28,599 | Tunnel | |
| Korea Expressway Corp. (Samsung) | Donghongcheon-Yangyang Exp. Sec. 13 (Girin 6 Tunnel) | 2,600 | 25,109 | Tunnel | |
| Gangneung Land Mgmt. Office | National Route 35 | 500 | 5,850 | Open | |
| Gangneung Land Mgmt. Office | National Route 42 | 2,100 | 20,876 | Open | |
| Korea Expressway Corp. (Kolon) | Busan Beltway Exp. Sec. 6 (Sineosan Tunnel) | 4,300 | 41,227 | Tunnel | |
| Korea Expressway Corp. (Ssangyong) | Yeongdong Exp. Sec. 2 (Dunnae Tunnel) | 4,400 | 42,866 | Tunnel | |
| Korea Expressway Corp. (Kolon) | Yeongdong Exp. Sec. 3 (Jinbu Tunnel) | 2,900 | 37,993 | Tunnel | |
| Korea Expressway Corp. (KCC) | Busan Beltway Exp. Sec. 10 | 4,017 | 16,043 | Open | |
| Korea Expressway Corp. (Daewoo) | Busan Beltway Exp. Sec. 1 | 1,300 | 4,330 | Open | |
| Korea Expressway Corp. (Daelim) | Busan Beltway Exp. Sec. 9 (Geumjeongsan Tunnel) | 7,200 | 68,160 | Tunnel | |
| 2016 | Korea Expressway Corp. (Daewoo) | Donghongcheon-Yangyang Exp. Sec. 14 (Inje Tunnel) | 11,000 | 146,000 | Tunnel |
| Korea Expressway Corp. (Gyeongnam) | Ulsan-Pohang Exp. Sec. 6 | 3,800 | 54,971 | Tunnel | |
| Korea Expressway Corp. (Hanjin) | Samcheok-Donghae Exp. Sec. 1 (Geundeok Tunnel) | 2,800 | 22,996 | Tunnel | |
| Korea Expressway Corp. (Lotte) | Sangju-Yeongdeok Exp. Sec. 4 (Ansa 1 Tunnel) | 858 | 7,522 | Tunnel | |
| Korea Expressway Corp. (Lotte) | Sangju-Yeongdeok Exp. Sec. 5 (Ansa 2, Anpyeong 1 Tunnel) | 4,118 | 39,542 | Tunnel | |
| Korea Expressway Corp. (Samhwan) | Sangju-Yeongdeok Exp. Sec. 6 (Anpyeong 3 Tunnel) | 1,462 | 13,872 | Tunnel | |
| Korea Expressway Corp. (Hanshin) | Sangju-Yeongdeok Exp. Sec. 7 (Danchon 1 Tunnel) | 757 | 17,241 | Tunnel | |
| Korea Expressway Corp. (Taepyeongyang) | Sangju-Yeongdeok Exp. Sec. 8 (Danchon 4 Tunnel) | 1,802 | 17,241 | Tunnel | |
| Korea Expressway Corp. (Hanwha) | Sangju-Yeongdeok Exp. Sec. 9 (Oksan Tunnel) | 707 | 6,590 | Tunnel | |
| Korea Expressway Corp. (Kolon) | Sangju-Yeongdeok Exp. Sec. 14 (Pacheon 3, Jinbo Tunnel) | 2,884 | 26,938 | Tunnel | |
| Korea Expressway Corp. (SK) | Sangju-Yeongdeok Exp. Sec. 17 (Dalsan 2,3 Tunnel) | 2,982 | 26,752 | Tunnel | |
| Korea Expressway Corp. (Lotte) | Sangju-Yeongdeok Exp. Sec. 18 (Yeongdeok Tunnel) | 2,837 | 26,078 | Tunnel | |
| Korea Expressway Corp. (Hanshin) | Yeongdong Exp. (Sindae Bridge) | 70 | 3,225 | Bridge | |
| 2015 | Korea Expressway Corp. R&D Center | Accelerated Pavement Testing | 100 | 200 | |
| Korea Expressway Corp. (Samsung) | Chungju-Jecheon Exp. Sec. 4 (Geumseong Tunnel) | 4,300 | 58,600 | Tunnel | |
| Korea Expressway Corp. (Dongbu) | Ulsan-Pohang Exp. Sec. 5 (Naengcheon 2,3 Bridge) | 460 | 4,000 | Bridge | |
| Korea Expressway Corp. (Doosan) | Ulsan-Pohang Exp. Sec. 7 (Yangbuk Tunnel) | 3,700 | 46,600 | Tunnel | |
| 2014 | Korea Expressway Corp. R&D Center | Jungbu Inland Exp. Test Section | 100 | 324 | Open |
| Korea Expressway Corp. (Lotte) | Ulsan-Pohang Exp. Sec. 4 | 500 | 7,800 | Tunnel |