Diamond Grinding
Diamond Grinding
Diamond Grinding (DG)
Diamond Grinding (DG) is a method that precisely cuts the surface of concrete pavements longitudinally using diamond blades. It restores road surface smoothness, reduces noise, and enhances skid resistance, greatly improving safety and driving comfort for road users.
HEXACON owns 3 units of the PC-6000 (685HP), the highest-specification diamond grinding equipment in the country, and has accumulated extensive DG construction experience on major expressways nationwide.
- Noise reduction: Average 3.4dB decrease
- Smoothness improvement: 42% enhancement
- Skid resistance enhancement: 37~66% improvement
- Hydroplaning prevention for wet weather safety
- Pavement life extension and maintenance cost reduction
Performance Indicators
Key performance improvement results measured after diamond grinding construction.
Performance Improvement Data
1. Noise Reduction
Traffic noise reduction of 2~4dB(A)
*Korea Expressway Corporation, "Concrete Pavement Surface Improvement Noise Reduction Measurement & Analysis", 2019. 04
Causes of Pavement Noise
Tire Vibration
Vibration noise from tire-road contact
Pitch (Pattern) Noise
Noise from tire pattern and road interaction
Air Pumping
Noise from air compression in tire grooves
2. Ride Comfort
Post-construction smoothness 1.22m/km
IRI improved by 1.15m/km
IRI (m/km)
| Phase | Lane | IRI (m/km) | Average | |
|---|---|---|---|---|
| Seoul-bound | Pocheon-bound | |||
| Before | 1 | 3.13 | 2.31 | 2.37 |
| 2 | 2.70 | 1.84 | ||
| 3 | 2.38 | 1.87 | ||
| After | 1 | 1.36 | 1.14 | 1.22 |
| 2 | 0.98 | 1.40 | ||
| 3 | 1.11 | 1.35 | ||
3. Safety
Post-construction Skid Number (SN) 55.7
Measurement Count
| Test | SN (Skid Number) | Average | ||
|---|---|---|---|---|
| 1 | 57.3 | 57.6 | 58.0 | 55.7 |
| 2 | 56.3 | 55.2 | 56.8 | |
| 3 | 54.3 | 53.9 | 52.2 | |
Construction Method
Principles and construction method of diamond grinding
Surface Micro-texture Formation Cutting
Diamond grinding rotates a cutting head densely fitted with diamond blades to finely cut the concrete surface longitudinally (in the direction of vehicle travel).
The cut surface forms a uniform longitudinal texture, providing the following benefits:
- Noise reduction through air discharge paths between the surface and tires
- Hydroplaning prevention through rainwater drainage via longitudinal grooves
- Enhanced skid resistance through uniform surface texture
- Smoothness recovery through removal of surface irregularities and step differences
DG Method Details
Surface Profile
Specifications
Deployed Equipment
We own 3 units of the PC-6000, specialized diamond grinding equipment.
| Model | Quantity | Length (M) | Height (M) | Width (M) | Cutting Width (M) | Weight (Tons) | Horsepower (HP) |
|---|---|---|---|---|---|---|---|
| PC-6000 | 3 | 14.3 | 3.3 | 2.5 | 1.27 | 24 | 685 |
Project Track Record
We have performed diamond grinding construction on major expressways and national roads nationwide since 2016.
| Year | Client | Route | Area (㎡) | Remarks |
|---|---|---|---|---|
| 2025 | Korea Expressway Corp. Seoul Gyeonggi HQ | Seoul Metropolitan 1st Beltway etc. | 29,600 | |
| Korea Expressway Corp. Seoul Metropolitan HQ | Seohaean Line etc. | 15,413 | ||
| Korea Expressway Corp. Chungbuk HQ | Pyeongtaek-Jecheon Line etc. | 16,248 | ||
| Korea Expressway Corp. Daejeon Chungnam HQ | Daejeon Southern Beltway etc. | 10,200 | ||
| Korea Expressway Corp. Gwangju Jeonnam HQ | Yeongam-Suncheon Line | 12,500 | ||
| Korea Expressway Corp. Daegu Gyeongbuk HQ | Gyeongbu Line | 27,500 | ||
| Korea Expressway Corp. Busan Gyeongnam HQ | Hamyang-Ulsan Line etc. | 29,167 | ||
| Korea Expressway Corp. Gangwon HQ | Seoul-Yangyang Line | 40,596 | ||
| Korea Expressway Corp. (Daewoo) | Pohang-Yeongdeok Expressway Sec. 3 (Namjeong Tunnel 3 etc.) | 12,783 | Incl. bridges | |
| Korea Expressway Corp. (Hyundai Industrial) | Pohang-Yeongdeok Expressway Sec. 4 (Namjeong Tunnel 7 etc.) | 9,400 | ||
| Korea Expressway Corp. (Hyundai Industrial) | Pohang-Yeongdeok Expressway Sec. 5 (Ganggu Tunnel 1 etc.) | 16,301 | ||
| Daegu Facilities Management Corp. | Sincheon-dong Road | 49,658 | ||
| 2024 | Korea Expressway Corp. Chungbuk HQ | Pyeongtaek-Jecheon Line etc. | 25,824 | |
| Korea Expressway Corp. Daejeon Chungnam HQ | Seocheon-Gongju Line etc. | 18,360 | ||
| Korea Expressway Corp. Busan Gyeongnam HQ | Jungbu Inland Line etc. | 20,083 | ||
| Korea Expressway Corp. Seoul Metropolitan HQ | 2nd Gyeongin Line etc. | 34,500 | ||
| 2023 | Korea Expressway Corp. Seoul Metropolitan HQ | Seohaean Line etc. | 36,567 | |
| Korea Expressway Corp. Gyeongbuk HQ | Jungang Line etc. | 31,104 | ||
| Korea Expressway Corp. Gangwon HQ | Yeongdong Line etc. | 6,600 | ||
| Korea Expressway Corp. Gwangju Jeonnam HQ | Honam Line etc. | 10,000 | ||
| Korea Expressway Corp. Chungbuk HQ | Jungbu Inland Line etc. | 32,736 | ||
| Korea Expressway Corp. Busan Gyeongnam HQ | Gyeongbu Line etc. | 16,358 | ||
| Korea Expressway Corp. Jeonbuk HQ | Honam Line etc. | 13,680 | ||
| 2022 | Korea Expressway Corp. Seoul Metropolitan HQ | Seohaean Line etc. | 32,066 | |
| Korea Expressway Corp. Gangwon HQ | Yeongdong Line etc. | 26,295 | ||
| Korea Expressway Corp. Chungbuk HQ | Jungbu Inland Line etc. | 29,088 | ||
| Korea Expressway Corp. Gwangju Jeonnam HQ | Honam Line etc. | 29,750 | ||
| Korea Expressway Corp. Gyeongbuk HQ | Gyeongbu Line etc. | 18,624 | ||
| Korea Expressway Corp. Jeonbuk HQ | Daejeon-Tongyeong Line etc. | 10,350 | ||
| Korea Expressway Corp. Daejeon Chungnam HQ | Seohaean Line etc. | 8,500 | ||
| Korea Expressway Corp. Busan Gyeongnam HQ | Busan Outer Ring etc. | 12,588 | ||
| Korea Expressway Corp. Hampyeong Branch | Muan-Gwangju Line | 8,286 | ||
| Korea Expressway Corp. Boseong Branch | Yeongam-Suncheon Line | 3,350 | ||
| Yongin-Seoul Expressway | Yongin-Seoul Line | 30,448 | ||
| 2021 | Korea Expressway Corp. (Kolon) | Daegu Beltway Expressway Sec. 3 | 4,300 | |
| Korea Expressway Corp. (Hanshin) | Daegu Beltway Expressway Sec. 7 | 8,800 | ||
| Korea Expressway Corp. Seoul Metropolitan HQ | Seoul Metropolitan 1st Beltway etc. | 94,703 | ||
| Korea Expressway Corp. Gangwon HQ | Yeongdong Line | 38,590 | ||
| Korea Expressway Corp. Chungbuk HQ | Jungbu Inland Line etc. | 53,928 | ||
| Korea Expressway Corp. Gwangju Jeonnam HQ | Honam Line etc. | 45,200 | ||
| Korea Expressway Corp. Dangjin Branch | Seohaean Line | 11,901 | ||
| Korea Expressway Corp. Gongju Branch | Dangjin-Daejeon Line | 10,080 | ||
| Korea Expressway Corp. Gunwi Branch | Jungang Line | 10,491 | ||
| Korea Expressway Corp. Boseong, Hampyeong Branch | Namhae Line etc. | 15,500 | ||
| 2020 | Ssangyong E&C Sec. 2 Miryang-Ulsan Expressway Division | Miryang-Ulsan Expressway | 8,968 | |
| Daebu E&C Sec. 3 Miryang-Ulsan Expressway Division | Miryang-Ulsan Expressway | 12,650 | ||
| Ssangyong E&C Sec. 4 Miryang-Ulsan Expressway Division | Miryang-Ulsan Expressway | 16,799 | ||
| SK E&C Sec. 5 Miryang-Ulsan Expressway Division | Miryang-Ulsan Expressway | 4,959 | ||
| Daelim E&C Sec. 7 Miryang-Ulsan Expressway Division | Miryang-Ulsan Expressway | 10,736 | ||
| Hanshin Engineering Sec. 8 Miryang-Ulsan Expressway Division | Miryang-Ulsan Expressway | 9,489 | ||
| Kolon Global Sec. 10 Miryang-Ulsan Expressway Division | Miryang-Ulsan Expressway | 10,676 | ||
| Korea Expressway Corp. Seoul Metropolitan HQ | Seoul Outer Ring etc. | 63,500 | ||
| Korea Expressway Corp. Busan Gyeongnam HQ | Gyeongbu Line etc. | 34,680 | ||
| Korea Expressway Corp. Gwangju Jeonnam HQ | Seohaean Line etc. | 20,900 | ||
| Korea Expressway Corp. Jeonbuk HQ | Honam Line etc. | 10,560 | ||
| Korea Expressway Corp. Gyeongbuk HQ | Gyeongbu Line etc. | 17,595 | ||
| 2019 | Korea Expressway Corp. Busan Gyeongnam HQ | Gyeongbu Line, Namhae Line etc. | 59,440 | |
| Korea Expressway Corp. Chungbuk Regional HQ | Jungbu Inland, Jungbu Line | 21,815 | ||
| Korea Expressway Corp. Gwangju Jeonnam HQ | Honam Line, Seohaean Line etc. | 49,752 | ||
| Korea Expressway Corp. Daegu Gyeongbuk HQ | Jungang Line | 19,752 | ||
| Korea Expressway Corp. Jeonbuk HQ | Suncheon-Wanju Line | 12,000 | ||
| Ssangyong E&C (Yeongdong Line Improvement Sec. 2) | Yeongdong Line | 6,037 | ||
| Korea Expressway Corp. Chungnam Regional HQ | Gyeongbu Line, Daejeon Southern Line | 17,820 | ||
| Korea Expressway Corp. Gwangju Jeonnam HQ | Dong-Gwangju TG Office | 3,588 | ||
| Korea Expressway Corp. Seoul Metropolitan HQ | Seoul Outer Ring, Jungbu Line | 70,605 | ||
| Korea Expressway Corp. Daegu Gyeongbuk HQ | Buk-Daegu, Nam-Daegu IC | 12,494 | ||
| Korea Expressway Corp. Gangwon HQ | Donghae Line | 19,017 | ||
| 2018 | Korea Expressway Corp. East Seoul Branch | Seoul Outer Ring | 32,220 | |
| Korea Expressway Corp. Gwangju Jeonnam HQ | Honam Line | 61,656 | ||
| Korea Expressway Corp. Busan Gyeongnam HQ | Gyeongbu Line, Namhae Line | 63,459 | ||
| Korea Expressway Corp. (Wibon E&C) | Jungbu Inland Line | 57,416 | ||
| Korea Expressway Corp. Jeonbuk HQ | Honam Line | 67,220 | ||
| Ministry of Land (Daewoo E&C) | Yongin National Road Bypass | 8,600 | ||
| Korea Expressway Corp. Daegu Gyeongbuk HQ | Jungang Line | 6,120 | ||
| Gangneung National Road Management Office | National Route 42 etc. | 5,475 | ||
| Hyundai E&C Eonyang-Yeongcheon Expansion Sec. 1 | Gyeongbu Line | 29,289 | ||
| Sambu Togun Eonyang-Yeongcheon Expansion Sec. 2 | Gyeongbu Line | 5,936 | ||
| Namkwang Togun Eonyang-Yeongcheon Expansion Sec. 6 | Gyeongbu Line | 50,044 | ||
| 2017 | Uijeongbu National Road Management Office | National Route 3 | 7,300 | |
| Uijeongbu National Road Management Office | National Route 37 | 4,966 | ||
| Korea Expressway Corp. Jeonbuk HQ | Honam Line | 17,018 | ||
| Korea Expressway Corp. Gwangju Jeonnam HQ | Honam Line | 15,888 | ||
| Korea Expressway Corp. Busan Gyeongnam HQ | Gyeongbu Line, Namhae Line | 40,965 | ||
| Korea Expressway Corp. (KCC E&C) | Busan Outer Ring Sec. 10 | 13,727 | ||
| Korea Expressway Corp. (Daewoo E&C) | Busan Outer Ring Sec. 8 | 10,000 | ||
| 2016 | Korea Expressway Corp. Road Traffic Research Institute | Samcheok-Sokcho Construction Division | 3,800 | |
| Korea Expressway Corp. Seoul Metropolitan Improvement Division | Yeongdong Line | 4,200 | ||
| Dongbu E&C et al. | Pyeongtaek-Jecheon Line | 38,460 | ||
| Gyeongsu Expressway Co., Ltd. | Yongin-Seoul Expressway | 9,074 | ||
| Korea Expressway Corp. Sangju-Andong Division | Sangju-Yeongdeok Expressway | 10,416 | ||
| Korea Land & Housing Corp. | Seoul Outer Ring | 92,048 |